Note: Only forum leaders may delete posts.
*HTML is ON *UBB Code is ON Smilies Legend
Smilies Legend
[b]NASA's OSIRIS-REx Mission Passes Critical Milestone[/b] NASA's groundbreaking science mission to retrieve a sample from an ancient space rock has moved closer to fruition. The Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRIS-REx) mission has passed a critical milestone in its path towards launch and is officially authorized to transition into its next phase. Key Decision Point-D (KDP-D) occurs after the project has completed a series of independent reviews that cover the technical health, schedule and cost of the project. The milestone represents the official transition from the mission's development stage to delivery of systems, testing and integration leading to launch. During this part of the mission's life cycle, known as Phase D, the spacecraft bus, or the structure that will carry the science instruments, is completed, the instruments are integrated into the spacecraft and tested, and the spacecraft is shipped to NASA's Kennedy Space Center in Florida for integration with the rocket. "This is an exciting time for the OSIRIS-REx team," said Dante Lauretta, principal investigator for OSIRIS-Rex at the University of Arizona, Tucson. "After almost four years of intense design efforts, we are now proceeding with the start of flight system assembly. I am grateful for the hard work and team effort required to get us to this point." OSIRIS-REx is the first U.S. mission to return samples from an asteroid to Earth. The spacecraft will travel to a near-Earth asteroid called Bennu and bring at least a 60-gram (2.1-ounce) sample back to Earth for study. OSIRIS-REx carries five instruments that will remotely evaluate the surface of Bennu. The mission will help scientists investigate the composition of the very early solar system and the source of organic materials and water that made their way to Earth, and improve understanding of asteroids that could impact our planet. OSIRIS-REx is scheduled for launch in late 2016. The spacecraft will reach Bennu in 2018 and return a sample to Earth in 2023. "The spacecraft structure has been integrated with the propellant tank and propulsion system and is ready to begin system integration in the Lockheed Martin highbay," said Mike Donnelly, OSIRIS-REx project manager at NASA's Goddard Space Flight Center in Greenbelt, Maryland. "The payload suite of cameras and sensors is well into its environmental test phase and will be delivered later this summer/fall." The key decision meeting was held at NASA Headquarters in Washington on March 30 and chaired by NASA's Science Mission Directorate. On March 27, assembly, launch and test operations officially began at Lockheed Martin in Denver. These operations represent a critical stage of the program when the spacecraft begins to take form, culminating with its launch. Over the next several months, technicians will install the subsystems on the main spacecraft structure, comprising avionics, power, telecomm, thermal systems, and guidance, navigation and control. The next major milestone is the Mission Operations Review, scheduled for completion in June. The project will demonstrate that its navigation, planning, commanding, and science operations requirements are complete.
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2024 collectSPACE. All rights reserved.